PUBLIC · ENTERPRISE · SAFETY AX PILOT

Start small, validate in real operations, and expand only with evidence.

COREON can be piloted as an execution and assurance layer without requiring an organization to replace every existing safety system. A limited scope can connect hazard discovery to owners, deadlines, corrective action, evidence, residual risk and human approval.

Limited Scope

Start with one site, workflow, asset group or contractor package.

8–12 Weeks

Use a period long enough to observe real operational behavior.

Baseline vs Current

Compare the existing process and pilot using the same agreed KPIs.

PASS / IMPROVE / HOLD

Expand, improve or pause based on evidence rather than assumptions.

Example KPIs: assignment time, average remediation time, overdue rate, evidence completeness, TBM completion, open risks, reopen rate and site/contractor status.